Mdina Bastions Stabilisation Works

Mdina Bastions Stabilisation Works

Restoration, Structure & Site Supervision

Mdina, Malta

This project involved the structural strengthening and stabilisation of a 25‐metre stretch of bastions underlying Council Square and part of the Xara Palace Hotel. This was a pilot project in view of the longer tract of bastions also showing signs of displacement. In particular, this was happening further to the south underlying Vilhena Palace. The displacement was characterised by a downward movement of the walls made evident by the cracks in the walls themselves and the buildings above. Before undertaking any interventions our office monitored the cracks over a 12‐month period and established that the cracks were live with significant movements occurring over the twelve months.

The contractors for this project were Ballut Blocks. TBA Periti were engaged as their restoration consultants and structural engineers.

Such movements had been noted for a long time with the first report of damage dating back to 1658, and some collapses occurring in 1956. Various studies of the problem have been carried out over the years. The most detailed investigation and appraisal of the situation was completed in 2003 after a long period of monitoring by the Università di Bologna.

After studying these reports and assessing the movement that occurred over the twelve months, our office formulated the hypothesis that the settlement was the result of differential movement of the underlying rock strata. The bastion was built on the edge of the Upper Coralline outcrop, lying on the Blue Clay layer which forms the typical slopes beneath the rock plateau. The varying moisture content in the clay led to successive softening, hardening, and fissuring cycles corresponding to seasonal rhythms. The settlement mechanism was not limited to a simple downward movement but was accompanied by an outward one.

The interventions included the drilling of vertical concrete piles designed to resist downward movement. The tops of the piles were restrained against lateral pressures using post‐tensioned anchor tendons, 26 metres deep, drilled into the rock mass, and tied together by a concrete pile cap at the base of the bastion to limit both vertical and horizontal displacements. The bastion wall was physically stitched using 10‐metre long specialised Diwidag bars. The designed system was closely monitored for a further 12 months and then adopted as the basis for the rest of the bastion stretch.

Our Projects Portfolio

Farsons Corporate Offices, Main Staircase

Architecture, Structure & Site Supervision

The concept finally developed into two flights of oval winding stairs, rising within a top‐lit atrium, making the climb as comfortable and well‐lit as possible, but also eye‐catching and uplifting.
View Project
Ta’ Betta Winery

Architecture, Structure & Site Supervision

The project is the culmination of the wine enthusiast’s dream. Underneath the cellars is a large reservoir to store harvested rainwater. Externally the winery is built in recycled stone to enable it to blend successfully in the rural setting.
View Project
Grandmasters’ Crypt, St. John’s Co-Cathedral

Restoration, Architecture, Structure & Site Supervision

Our office was responsible for the overall design and execution of the project, bringing together the necessary expertise to identify the best possible and least intrusive routes for mechanical equipment, ensuring that the interventions were both achievable and sustainable.
View Project
Farsons Corporate Offices, Main Entrance Building

Architecture, Structure & Site Supervision

The solution is based on an elevated cube, comprising a steel frame, clad in multi-faceted Bianco Carrara marble – with a pattern subtly referring to the Trident logo - overlying the fully glazed ground floor.

To a certain extent, this is what we wished would respond to the challenge of the original 1950’s grand entrance hall.
View Project
Hillock Residences

Project Management & Structure

Our work involved the co‐ordination between the different sub‐contractors and trades. We also undertook the structural design and detailing of the substructure of the southernmost block.
View Project
Life Sciences Park

Architecture, Structure & Site Supervision

The design of the Life Sciences Park was based upon an integrated approach to the functional requirements and the primary objective of achieving sustainable development within the project.
View Project
Ġgantija Visitors Centre

Project Management

Our tasks involved the co‐ordination between the various sub‐ contractors and finishing trades. We were also tasked with the production of detail drawings for the precast concrete insulated sandwich wall system, which forms the principal loadbearing elements of the buildings.
View Project
Fort St. Elmo Caraffa Enciete

Restoration & Project Management

The works for this project involved the restoration of the various blocks situated in the Caraffa Enceinte along the bastion walls forming upper St. Elmo. These blocks date mostly from the late 1800s, and include the final resting place of Sir Alexander Ball.
View Project
E‐Pantar Offices

Architecture, Structure & Site Supervision

Our brief was to provide our clients with offices enjoying ample natural lighting thereby ensuring quality and attractive spaces aimed at rental tenants seeking something above the cut of the current market.
View Project
MUŻA Art Museum, Auberge D’Italie

Competition Entry (Restoration & Architecture)

TBA joined a slew of top overseas consultants, including Hilson Moran, Metaphor, Local Projects lead by Jake Barton, Burlando Architettura, to submit an entry for the MUŻA design concept.
View Project
The Brewhouse

Restoration & Rehabilititation, Structure, Architectural Detailing & Site Supervision

TBA Periti were responsible for the structural and architectural detailing of the project for construction, and acted as the resident engineers and restoration architects for the duration.
View Project
Trident Park

Restoration & Rehabilititation, Structure, Architectural Detailing & Site Supervision

Transforming the brewery buildings into an office campus, and the old brew‐house into places for start‐up offices and heritage spaces.
View Project
Offices in Old Bakery Street

Restoration, Architecture, Structure & Site Supervision

This project involved the total rehabilitation of a dilapidated property in Valletta for which our office was responsible for the architectural and structural designs, and supervision of the execution
View Project