Fort St. Elmo Caraffa Enciete

Fort St. Elmo Caraffa Enciete

Restoration & Project Management

Valletta, Malta

The works for this project involved the restoration of the various blocks situated in the Caraffa Enceinte along the bastion walls forming upper St. Elmo. These blocks date mostly from the late 1800s, and include the final resting place of Sir Alexander Ball. Other later structures were added most likely before World War II. The interventions therefore included the much older bastion walls forming upper St Elmo pre‐dating the founding of Valletta in the time of the Order of St John. More challenging interventions were needed on the steel and concrete gun emplacements, heavily utilised during the war. These gun emplacements were composed of large steel sections and had to be restored on site, meaning that most of the surrounding stone masonry had to be carefully dismantled, numbered, and eventually reinstated, after as much as possible of the steel work was grit blasted and protected with a paint system.

Not all of the steel could be accessed because some parts were cast within thick sections of concrete, which could not be dismantled. The repairs to the concrete was very interesting since probably for the first time on such a large scale, available technologies were applied to historic and protected structures.

The contractors for this project were a joint venture formed by Agius Stoneworks, Camray, Vassallo Builders, and Vaults (calling themselves C.A.V.V. Joint Venture). Our office was engaged as their project manager and restoration consultants. Tight co‐ordination and technical guidance was needed by the consortium.

Our Projects Portfolio

Farsons Corporate Offices, Main Staircase

Architecture, Structure & Site Supervision

The concept finally developed into two flights of oval winding stairs, rising within a top‐lit atrium, making the climb as comfortable and well‐lit as possible, but also eye‐catching and uplifting.
View Project
Ta’ Betta Winery

Architecture, Structure & Site Supervision

The project is the culmination of the wine enthusiast’s dream. Underneath the cellars is a large reservoir to store harvested rainwater. Externally the winery is built in recycled stone to enable it to blend successfully in the rural setting.
View Project
Grandmasters’ Crypt, St. John’s Co-Cathedral

Restoration, Architecture, Structure & Site Supervision

Our office was responsible for the overall design and execution of the project, bringing together the necessary expertise to identify the best possible and least intrusive routes for mechanical equipment, ensuring that the interventions were both achievable and sustainable.
View Project
Farsons Corporate Offices, Main Entrance Building

Architecture, Structure & Site Supervision

The solution is based on an elevated cube, comprising a steel frame, clad in multi-faceted Bianco Carrara marble – with a pattern subtly referring to the Trident logo - overlying the fully glazed ground floor.

To a certain extent, this is what we wished would respond to the challenge of the original 1950’s grand entrance hall.
View Project
Hillock Residences

Project Management & Structure

Our work involved the co‐ordination between the different sub‐contractors and trades. We also undertook the structural design and detailing of the substructure of the southernmost block.
View Project
Mdina Bastions Stabilisation Works

Restoration, Structure & Site Supervision

This project involved the structural strengthening and stabilisation of a 25‐metre stretch of bastions underlying Council Square and part of the Xara Palace Hotel.
View Project
Life Sciences Park

Architecture, Structure & Site Supervision

The design of the Life Sciences Park was based upon an integrated approach to the functional requirements and the primary objective of achieving sustainable development within the project.
View Project
Ġgantija Visitors Centre

Project Management

Our tasks involved the co‐ordination between the various sub‐ contractors and finishing trades. We were also tasked with the production of detail drawings for the precast concrete insulated sandwich wall system, which forms the principal loadbearing elements of the buildings.
View Project
E‐Pantar Offices

Architecture, Structure & Site Supervision

Our brief was to provide our clients with offices enjoying ample natural lighting thereby ensuring quality and attractive spaces aimed at rental tenants seeking something above the cut of the current market.
View Project
MUŻA Art Museum, Auberge D’Italie

Competition Entry (Restoration & Architecture)

TBA joined a slew of top overseas consultants, including Hilson Moran, Metaphor, Local Projects lead by Jake Barton, Burlando Architettura, to submit an entry for the MUŻA design concept.
View Project
The Brewhouse

Restoration & Rehabilititation, Structure, Architectural Detailing & Site Supervision

TBA Periti were responsible for the structural and architectural detailing of the project for construction, and acted as the resident engineers and restoration architects for the duration.
View Project
Trident Park

Restoration & Rehabilititation, Structure, Architectural Detailing & Site Supervision

Transforming the brewery buildings into an office campus, and the old brew‐house into places for start‐up offices and heritage spaces.
View Project
Offices in Old Bakery Street

Restoration, Architecture, Structure & Site Supervision

This project involved the total rehabilitation of a dilapidated property in Valletta for which our office was responsible for the architectural and structural designs, and supervision of the execution