The Brewhouse

The Brewhouse

Restoration & Rehabilititation, Structure, Architectural Detailing & Site Supervision

Central Business District, Malta

Very conscious of the cultural heritage inherent in the Farsons industrial complex, the clients, following an international selection process, chose Ritchie Studios (at the time Ian Ritchie Architects Ltd) for their proposal to transform the brew‐house into places for start‐ up offices and heritage spaces. Just like for Trident Park, TBA Periti were responsible for the structural and architectural detailing of the project for construction, and acted as the resident engineers and restoration architects for the duration.

The collaboration started with a meticulous study of the working drawings from 1949, preserved in the Farsons archives, to understand the construction methods and processes of the Brewhouse. This was followed by thorough site investigations with destructive and non‐ destructive testing of samples from various parts of the building. An assessment of the current status of the building beneath the extensively spalled sections was thus possible.

This allowed the office to carry out a finite‐element analysis of the slip‐formed walls to study the effects of proposed interventions on the existing structure.

One area which required detailed attention was the main brewing chamber containing the impressive copper brewing kettles. The structure was severely compromised due to the corrosive cleaning chemicals used during the brewing operation. However the structure could not be replaced as the copper vessels form an integral part of the structure itself. The entire floor slab and the vessels had to be supported while the reconstruction of the beams and columns with additional reinforced concrete jackets took place inside chamber.

An even more daring operation was adopted at the uppermost level where there are two cooling chambers, called the chapels, roofed over by convex curved concrete shells. In the underlying floor, loadbearing walls were reinforced and stiffened, new beams cast, and the floor of the chapels replaced bodily. The same process was used in the space adjacent to the chapels to cast a new set of beams to support the steel portal frame at the new Level 5.

The careful study of the structure and the significant repairs and consolidation works have allowed transformation of the interior of the brew‐house into rooms full of light. The roof itself has been opened by two large skylights to flood the lower levels with natural light. Since the Brewhouse will have an independent operation it has a new access across a 22‐ metre steel bridge inviting visitors to the brewing experience museum. It is a new span of life to the building after 70 years of use and abuse.

Photo Credits: TBA Periti and Joe Smith

Our Projects Portfolio

Farsons Corporate Offices, Main Staircase

Architecture, Structure & Site Supervision

The concept finally developed into two flights of oval winding stairs, rising within a top‐lit atrium, making the climb as comfortable and well‐lit as possible, but also eye‐catching and uplifting.
View Project
Ta’ Betta Winery

Architecture, Structure & Site Supervision

The project is the culmination of the wine enthusiast’s dream. Underneath the cellars is a large reservoir to store harvested rainwater. Externally the winery is built in recycled stone to enable it to blend successfully in the rural setting.
View Project
Grandmasters’ Crypt, St. John’s Co-Cathedral

Restoration, Architecture, Structure & Site Supervision

Our office was responsible for the overall design and execution of the project, bringing together the necessary expertise to identify the best possible and least intrusive routes for mechanical equipment, ensuring that the interventions were both achievable and sustainable.
View Project
Farsons Corporate Offices, Main Entrance Building

Architecture, Structure & Site Supervision

The solution is based on an elevated cube, comprising a steel frame, clad in multi-faceted Bianco Carrara marble – with a pattern subtly referring to the Trident logo - overlying the fully glazed ground floor.

To a certain extent, this is what we wished would respond to the challenge of the original 1950’s grand entrance hall.
View Project
Hillock Residences

Project Management & Structure

Our work involved the co‐ordination between the different sub‐contractors and trades. We also undertook the structural design and detailing of the substructure of the southernmost block.
View Project
Mdina Bastions Stabilisation Works

Restoration, Structure & Site Supervision

This project involved the structural strengthening and stabilisation of a 25‐metre stretch of bastions underlying Council Square and part of the Xara Palace Hotel.
View Project
Life Sciences Park

Architecture, Structure & Site Supervision

The design of the Life Sciences Park was based upon an integrated approach to the functional requirements and the primary objective of achieving sustainable development within the project.
View Project
Ġgantija Visitors Centre

Project Management

Our tasks involved the co‐ordination between the various sub‐ contractors and finishing trades. We were also tasked with the production of detail drawings for the precast concrete insulated sandwich wall system, which forms the principal loadbearing elements of the buildings.
View Project
Fort St. Elmo Caraffa Enciete

Restoration & Project Management

The works for this project involved the restoration of the various blocks situated in the Caraffa Enceinte along the bastion walls forming upper St. Elmo. These blocks date mostly from the late 1800s, and include the final resting place of Sir Alexander Ball.
View Project
E‐Pantar Offices

Architecture, Structure & Site Supervision

Our brief was to provide our clients with offices enjoying ample natural lighting thereby ensuring quality and attractive spaces aimed at rental tenants seeking something above the cut of the current market.
View Project
MUŻA Art Museum, Auberge D’Italie

Competition Entry (Restoration & Architecture)

TBA joined a slew of top overseas consultants, including Hilson Moran, Metaphor, Local Projects lead by Jake Barton, Burlando Architettura, to submit an entry for the MUŻA design concept.
View Project
Trident Park

Restoration & Rehabilititation, Structure, Architectural Detailing & Site Supervision

Transforming the brewery buildings into an office campus, and the old brew‐house into places for start‐up offices and heritage spaces.
View Project
Offices in Old Bakery Street

Restoration, Architecture, Structure & Site Supervision

This project involved the total rehabilitation of a dilapidated property in Valletta for which our office was responsible for the architectural and structural designs, and supervision of the execution
View Project